BACS Test

ADQUIO · BACS Compliance Test
Regulation
Your details
3
Test + result
⚠ Possible legal non-compliance in force
Based on your answers, your building may not comply with the BACS obligation in force in your country for non-residential buildings with power >290 kW. The maximum EU/EEA transposition deadline is 29 May 2026. We recommend acting urgently. Note: If your building is located in the UK, similar requirements apply under Building Regulations Part L and the UK MEES framework, although EPBD does not apply directly post-Brexit.
Question 1 of 9 0%
Regulatory context
In which country or region is the building located?
Datos del building
What is the nominal useful installed power of the building's HVAC systems? Include heating, cooling, ventilation and domestic hot water production, if applicable.
HVAC Control · Domain 01
How is the building's HVAC system currently controlled?
Lighting · Domain 02
How does the building's lighting system work?
Monitoring · Domain 04
Is there any centralised supervision system in the building?
Energy efficiency · Domain 05
Is energy consumption measured broken down by subsystem (submetering)?
Interoperability · Domain 06
Do the building's systems communicate with each other?
Documentation status
Do you have valid BACS documentation for an audit?
Your priority
What is your main objective regarding the BACS regulation?
EPBD Status
Recommended Action
Recommended ADQUIO solution
Indicative estimated investment

PHP Code Snippets Powered By : XYZScripts.com
Privacy Overview
Adquio

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.